“Ensures the appropriate allocation of Spatial resources & Analyze the existing use of the space by effectively apply transition planning management towards any applicable changes”
Space Management plays a vital role & satisfy the BIM LOD 350 criteria in Common Corridor areas as well as in specific discipline owned spaces.
GENERAL INTRODUCTION
- The purpose of this document is to propose a procedure that provides sufficient guidance to all discipline team members with respect to their obligations to support space management tasks, across evolving stages of the design and construction process.
- In addition, the document strives to provide suitably comprehensive technical recommendations that intend to standardize, philosophically, a space management plan that is appropriate for all Typical projects
- This procedure is not prescriptive in nature, though it does propose some specific default information, where such information will likely be beneficial to the team. When actual project data is available, need precise checks to validate default data
CORE RESPONSIBILITIES
- Overall Coordination For SPM’s Respective Areas
- Wall Openings Coordination
- Floor Openings Coordination
- Plinth Requirements
- Equipment Move In Details
- Pipe Rack Supports
- Clash Clearance